hole removal project – 23 oct 2013

so true to his word marcello came by after breakfast and started work on the holes in the bathroom. the new head requiered new holes and left behind 4 old ones. i did not really notice these but aimee did not consider them “charter” ready and rejected my white duct tape idea. the night before marcello had hot glued 1/8 inch fiberglass in behind the holes and this am he mixed up resin, hardener and mat bits into a past and mushed into the holes.

the process was pretty smooth but definitely gives off fumes. i was barricaded in the aft head reinstalling the mirror and could still smell the fumes. i decided to take the opportunity to head over to the moorings base to vist seth and jamie on dolphin daze (DD to us). i ran into kieth and diana on the way over and joined them for a beer while we waited for their cab to return. the cab was $50 for their shopping event, a big difference from the 1$ publico over in the usvi

i was hoping to get a ride back from seth in the new center console dingy he was supposed to have but alas he was still negotiating getting permission to put on together. i made it back to palapa via another 15$ 10 min cab ride and found aimee and don finishing up a palapa party. apparently tom and don had come by for beers to take advantage of the new cooler. cant wait for the lid!

Comments are closed.